CONSTRUCTION PERIOD

Proposal confirmation before construction 

The design drawing from DI before construction is very short, so it is difficult to meet the construction requirements. We will deepen the drawing before construction


Technical clarification and training 

Attendee: NTSJ engineers, construction managers and team responsible person.

  

Factory check

Special materials will be checked in the factory to guarantee the quality and schedule;


According to order plan, make the factory check schedule; and take care of the control points;



Materials site entering check

Photo recording

   


Install samples on site and communicate with workers about technical clarifications. The testing piece shall pass the approval before big area construction work. The work shall be done in one time to avoid quality issue.




Steel structure control points quality control


Floor quality control


Crack control: 1. base layer treatment, 2. raw materials, 3. construction control


Construction  duration control

A 4-level planning mode will be taken for the arrangement and control of constructionschedule to achieve all targets.